Monday, July 6, 2009
3 Days On Deck
This was an interesting 3 days of soul searching and reminding myself that Rome wasn't built in a day. Once I lowered my expectation of how quickly things would move, they started to go a LOT better. Funny how that works. More details later, but here are a c
ouple of pics.

Saturday, July 4, 2009
Sunday, June 21, 2009
First Strips
FINALLY getting started!
This weekend I cut all the cedar strips on the table saw using a glue-face blade. Last weekend I tried cutting strips on the bandsaw (less kerf loss), but the finish is too rough for gluing without sanding first. Life's too short for that, so I decided to sacrifice 30% fibre loss to table saw blade kerf. The benefit was that the strips were cut quickly and the edges are smooth. There will be more payoff later too in reduced sanding time.
Here are the built-up strips. Once each strip is assembled it goes onto the form and is edge-glued to the adjacent piece.
I am using two clamping methods here.
The first is very fine fishing line which is pull tight around the newly glued piece, wrapped around the shearline brace and clamped with spring-clamps. The benefit is that as soon as one row is glued, the next can be laid up and glued. When the glue is dry, it is easy to pull the fishing line thru and reuse it in a new location.
The second clamp is the combo rubber-band / bull-clip (heavy-duty office paper clip). These are exerting a downward force on the strips to keep them tight against the form.
Sunday, June 14, 2009
Test Strips
This effort is likely to end up in the fire-pit. Some days are productive, some aren't.
Wednesday, June 10, 2009
Finishing the Strong Back
All the forms got positioned, squared up, and braced with blocking. Then I installed the Shear Line Bracing using an air-driven stapler with 3/4" staples.
...and here's the stern.
Later, a black bear stopped by to check out my boat, although Rick said he was really checking out the BMW.
: )
Sunday, May 31, 2009
Setting Up the Strong Back
The support consists of 6 inverted T's each made of two layers of 3/4" G1S plywood sandwiching 3/4" Baltic birch in the base, for receiving threaded 1/4" inserts and plastic feet, and a gap at the top where an L will be mounted and height adjusted for receiving the strong back. The adjustment is necessary because the strong back varies in depth from 3", to 4" to 5" and back to 3" as it goes down the boat. As long as the support is rigid and close to being aligned, the fine-tune adjustments can be made with the L pieces as shown below.
The longitudinal and vertical position of the T's are held by 2x6's which are lag-bolted (not shown) and bolted thru with ready-rod.
Note that it is common to build kayaks making the hull first, therefore mounting the strong back upside-down initially. I have a reason to build the top decks first, which I will get into later when we get to that part.
This photo also shows my first boat hanging in the rafters, and the form for it up on a rack on the wall to the right. Hopefully I'll get "My Escape" into the water soon so I can row while the new boat is getting built.
Saturday, May 23, 2009
Shearline Bracing
I have decided to install a 1/4" x 3/4" strip along the shearline. Because I intend to use a non-linear layup of strips, I'm going to need somewhere to clamp the strips to when they land between form stations. To do this I needed to scribe and then cut out a notch for the strip on each form.

Here you can see how the shearline bracing starts to define the shape of the boat.
Tiny form!
Subscribe to:
Posts (Atom)
